Things that still need to be done (there may be more that I'm not thinking of):

1. Insulation in utility closet (Check- as of 2/8 am)
2. HVAC/Thermostat/Vents/Hood installation
3. Kitchen installation (with appliances- half way check as of 2/8pm) Need plumber to change a few things.
4. Wall patch up and final paint
5. Bathroom tiles/sinks/vanities
6. Toilets
7. Inspection on plumbing and cover up ditches (inspection failed 2/7--need to fix it)
8. Driveway
9. New front door
10. Replace broken windows
12. Finish Trim in living room with new front door
13. Uncover floors
14. Clean clean clean!!
15. Install mailbox
16. Pass final inspection
17. Get CO!!!